1. The Stage 1 report details the work undertaken under Stage 1 of the Conwy Tidal Flood Risk Assessment study and provides a
scientific appraisal of the extreme loading on the defences and their likely response in terms of overtopping and breaching at present
day and taking also into account climate change impacts on water levels and waves. the latest version was produced in May 2008.
2. The Llandudno inundation modelling report that provides details on the flood inundation modelling and mapping undertaken for
Llandudno to produce maps in accordance with Technical Advice Note 15 (TAN 15) guidance on flood risk. The latest version was produced
in May 2006.
3. The Towyn inundation modelling report that provides details on the flood inundation modelling and mapping undertaken for Pensarn
to Kinmel Bay to produce maps in accordance with Technical Advice Note 15 (TAN 15) guidance on flood risk. The latest version was produced
in December 2009.
4. Llandudno inundation modelling drawings from the present day flood inundation modelling.
5. Towyn inundation modelling drawings from the present day flood inundation modelling.